Kingsway Burgess Hill

Kingsway

location icon - Enplan

Planning

Type:
Planning

Client:
Sunley Group

Permission was ob­tained in 2014 and the development is currently under phased construction.

The site comprises a complex C18 enclosure landscape of small-sized pasture fields with substantial mature hedgerows and some fine double hedgerow ‘greenways’, with rolling topography and an intricate ditch system. The site also abuts Ditchling Common SSSI, onto which it drains.